WOODSIDE COMPUTING FACILITY - 1 ADELAIDE TERRACE, PERTH

Research Computer Room

• Construct a computing suite of 250 square metres complete with fire rated walls and a 600mm access floor.

• Provide a dedicated, precision environment control, air conditioning system capable of staged operation.

• Support the computing suite with a 300 KVA 100% redundant Uninterruptable Power Supply (UPS).


Existing Corporate Computing Suite

• Modify existing building infrastructure to provide a stand-by diesel generator supply to all computer suite building services e.g. UPS, computer suite air conditioning and alarms.

• Provide a network of UPS distribution boards throughout the building.

• Provide new and upgrade existing on-site monitoring facilities.

• Provide a load bank facility for routine ‘on load’ testing of both diesel generators.

Woodside’s existing Corporate computing suite forms a hub for a safe operation of all offshore oil rigs within the North West Shelf and Timor Sea.

As a result unscheduled computing downtime could not be tolerated. All work was completed with a single, schedule downtime of two hours.

All works were undertaken within a fully occupied and operational building as disruption to the business was unacceptable.







 